Find my builder
500 m
Cammeray — 1.55 km². Boundary from the ABS Australian Statistical Geography Standard 2021, simplified. The same boundary every figure on this page was read against.

NSW · Sydney — Lower North Shore

Home builders in Cammeray

A builder’s licence is permission to trade. It is not a solvency test. 2,361 construction companies entered external administration last financial year, more than any other industry in the country — and no regulator checks whether the one quoting your Cammeray job can still pay its framer on Friday. We run the Four-Point Builder Check™: licence with NSW Fair Trading, insurance sighted, still trading, and genuinely working in Cammeray. Then one name and the reasoning behind it — or a straight no.

Find my builder — free 3 minutes · free · you pay nothing, ever
  • Costs you nothing, ever
  • No obligation to use them
  • Details never sold
North Sydney CouncilNorth Sydney Local Environmental Plan 2013 Knockdown rebuild
2,361Construction companies entered external administration in 2024–25 — more than any other industry in Australia (ASIC)
3Overlay families mapped in Cammeray, each one something a builder prices differently
45Heritage records intersecting Cammeray. Your own house need not be listed for them to reach your project

Why this is harder than it looks in Cammeray

Have us check instead — free →

Knockdown rebuild — the kind of build this page is about. A drawing, not a photograph of a house in Cammeray.

What building in Cammeray actually involves

Cammeray maps no floor space ratio at all. That absence is the most useful thing on this page, because it changes which questions decide your project — and most people arrive expecting a ratio to be the answer.

No ratio means the envelope comes from somewhere else

In most lower North Shore suburbs the floor space ratio is the number that caps the house: block area multiplied by the ratio, every level counted. Where no ratio is mapped, bulk is controlled by the other instruments instead — the 8.5 m height limit, setbacks, site coverage and the development control plan that North Sydney Council applies beneath the LEP. Practically, that means the DCP is doing more work here than the LEP, and a builder who prices from the LEP alone has read half the controls.

8.5 metres on a clear majority

The most common maximum building height is 8.5 m, on 67 of 92 mapped parcels, with controls elsewhere in the suburb running to 12 m. A majority this size means the suburb-level figure is genuinely usable: 8.5 m accommodates two storeys and a roof without argument. With no ratio in play, height and setback are the two controls to design against.

Two minimum-lot bands, and both are small

Two bands are mapped: 450–474 m² on 46 parcels and 200–249 m² on 25. These are tightly subdivided numbers, and they explain the grain of the place — narrow blocks, close neighbours, and a boundary condition that does most of the design work. On land this size, setbacks and overshadowing are not background compliance; they are the brief.

Forty-five heritage records, in three kinds

Forty general items, two general conservation areas and three landscape items are mapped under the North Sydney Local Environmental Plan 2013. The three behave differently and the total tells you little. A general item constrains that property. A conservation area constrains the streetscape — and with no floor space ratio mapped, inside a conservation area the DCP becomes close to the whole of the control. A landscape item can attach to trees and setting rather than to a building, which on blocks this size can determine where a house physically goes.

Three reservations, three different purposes

Three parcels are reserved for future public acquisition, one each for environmental conservation, regional open space and public recreation. One parcel apiece is a low probability, but a reservation is not something a consent condition can lift, and confirming it against an address takes minutes.

Bush fire and acid sulfate along the creek lines

Seven bush fire features are mapped — vegetation buffer and vegetation category 2 — and four acid sulfate soil features. Both follow the gully country around Flat Rock Creek and Willoughby Creek and the land falling to Tunks Park. A block inside the bush fire mapping needs a Bushfire Attack Level assessment before the construction standard can be priced; the acid sulfate class and trigger depth decide whether excavation needs testing and treatment.

Three zones on 1.55 km²

R3 Medium Density Residential is the principal zone, with R2 Low Density and R4 High Density also mapped in a small suburb. For someone building a house the useful question is usually not what your own block allows but what the land behind it allows, because with R4 in the mix that is what decides outlook and overshadowing.

What to establish on a Cammeray block

Get the development control plan, not just the LEP — with no floor space ratio mapped, the DCP carries the controls that decide the size of the house. Then the height at the address and the setbacks that go with it. Then the minimum-lot band, because 200–249 m² and 450–474 m² are different propositions. Then the heritage kinds that reach the block. Flood sits with North Sydney Council rather than centrally.

What you are dealing with in Cammeray

Six things a builder prices differently. This is the suburb-level picture — which of them reaches your block is an address check.

What is mapped in Cammeray

Read from NSW ePlanning Spatial Viewer, not a summary of it.

Council
North Sydney Council
Planning scheme
North Sydney Local Environmental Plan 2013
Overlays mapped here
Heritage — Item - General · Heritage — Conservation Area - General · Heritage — Item - Landscape
Residential zones mapped
R2 Low Density Residential
R3 Medium Density Residential
R4 High Density Residential
Bushfire-prone land
Mapped in this suburb
Mine subsidence district
Not in one
Heritage items mapped
45
Minimum lot size
450-474 m² minimum (most common of 2 minimum-lot-size bands mapped in the suburb)
Typical height limit
8.5m
Land reserved for acquisition
Environmental Conservation · Regional Open Space · Public Recreation
Acid sulfate soils
Mapped in this suburb

Planning data from NSW ePlanning Spatial Viewer (CC BY 4.0), read 2026-09-20. Suburb-level, not a report on your block — check your address on the NSW Planning Portal.

Bushfire categories mapped here

Vegetation BufferVegetation Category 2
The category recorded for the suburb is not the rating for a lot. Where mapping reaches a block, a Bushfire Attack Level is assessed on that site and drives the construction standard.

Worth knowing before you budget

The mechanism

The Four-Point Builder Check™

Every one of them is something you could do yourself. What we sell is that it has been done, dated and published — and repeated on a schedule, because a check that happened once is worth nothing.

  • 01 · Licence

    Looked up on NSW Fair Trading's own public register — number, class and status, with the date we looked recorded.

  • 02 · Insurance

    Public liability plus whatever warranty or indemnity cover NSW requires. Sighted by us, not self-declared on a form.

  • 03 · Still trading

    Solvency re-checked on a schedule. A licence stays current right up until the day a company fails.

  • 04 · Works in Cammeray

    Confirmed with the builder against the suburbs they genuinely service — not a radius drawn on a map.

Have us run the check — free →

How this works

  1. 01
    Tell us about the build

    Seven questions, about three minutes.

  2. 02
    We match it against Cammeray

    Against the 3 residential zones mapped here, 3 overlay families, bushfire-prone land, 45 heritage records — and against which builders hold the right licence class for it, have done it before, and actually work under North Sydney Council.

  3. 03
    One recommendation, with the reasoning

    Not six quotes to sift. We negotiate on your behalf; you deal with the builder directly. Builders pay us, only once you sign.

What you get, and what it costs you

We are not a builder, we do not manage your build, and we do not hold your money.

A completed two-storey contemporary Australian home at dusk, built around a retained eucalypt.
Illustrative. We do not publish project photography until a builder we have checked gives us one of their own — so this is not a build of ours and not a house in Cammeray.

Fair questions before you send anything

Builders serving Cammeray

None verified in Cammeray yet. We will not list one we have not checked — give us the brief and we will go and find one. Tell us what you're building →

Questions about building in Cammeray

Why is there no floor space ratio in Cammeray?

None is mapped. Bulk is controlled by the height limit, setbacks, site coverage and North Sydney Council's development control plan instead. The practical consequence is that the DCP does more work here than the LEP, and a quote priced from the LEP alone has read half the controls.

What height can I build to in Cammeray?

The most common maximum is 8.5 m, on 67 of 92 mapped parcels — a clear majority, so it is a usable starting point. Controls elsewhere in the suburb run to 12 m. With no floor space ratio mapped, height and setback are the two controls to design against.

How big are the blocks in Cammeray?

Small, and that shapes everything. Two minimum-lot bands are mapped: 450–474 m² on 46 parcels and 200–249 m² on 25. On land this tightly subdivided, setbacks and overshadowing are the brief rather than background compliance.

What do the landscape heritage items affect?

They can attach to trees and setting rather than to a building. Three are mapped alongside 40 general items and two conservation areas. On blocks as small as Cammeray's, a protected tree can decide where the house physically goes.

Does Cammeray have bush fire risk?

Part of it. Seven features are mapped as vegetation buffer and vegetation category 2, following the gully country around Flat Rock and Willoughby Creeks and the fall to Tunks Park. A block inside the mapping needs a Bushfire Attack Level assessment.

Is Cammeray in a mine subsidence district?

No. Cammeray is not inside any declared mine subsidence district. The districts are declared under statute and recorded centrally, so this is a read rather than a gap.

What to ask a builder about a block in Cammeray

Each one is here because of something mapped in Cammeray. Take them to whoever quotes.

  1. 01

    Which of the 3 residential zones mapped in Cammeray covers this address, and what does that one permit that the others do not?

  2. 02

    What bushfire attack level have you built to in Cammeray before, and what did it change in the glazing, decking and screening?

  3. 03

    Have you had an application through North Sydney Council where a heritage control applied, and how long did the assessment take?

  4. 04

    What height control is mapped at this address? It is set block by block in Cammeray, not suburb-wide.

Local landmarks in Cammeray

No catch

What you are agreeing to

  • Nothing. There is no contract with us, no account to create, no card, and nothing to cancel.
  • No obligation to use whoever we recommend. Take the name and the reasoning and do what you like with it, including nothing.
  • No phone number needed to start. Give us one if you want to be called; otherwise we write.
  • One builder contacts you, not six. And only after you have seen the brief and said yes.
  • Your details go to that builder and nobody else. Never sold, never auctioned, never shared with a panel.
  • If we have nobody in Cammeray, we say so. That is a real answer we give, and the empty builder list above is the proof we mean it.

Building in Cammeray?

Licence checked with NSW Fair Trading, insurance sighted, still trading, genuinely working in Cammeray. If we cannot find one worth recommending, we will say so.

Find my builder — free →

Free · about 3 minutes · no obligation · your details are never sold

Named watercourses in Cammeray

2 named watercourses are mapped in Cammeray. On any individual block the question is which of them is nearest, because that is what the setback is offset from and what the flow path follows.

Read from the NSW Water Theme, which maps gazetted watercourses only. A constructed channel or a stormwater drain is not in this list and can still carry water across a block.