Find my builder
2 km
Uki — 16.34 km². Boundary from the ABS Australian Statistical Geography Standard 2021, simplified. The same boundary every figure on this page was read against.

NSW · Northern Rivers — Tweed Coast

Home builders in Uki

A builder’s licence is permission to trade. It is not a solvency test. 2,361 construction companies entered external administration last financial year, more than any other industry in the country — and no regulator checks whether the one quoting your Uki job can still pay its framer on Friday. We run the Four-Point Builder Check™: licence with NSW Fair Trading, insurance sighted, still trading, and genuinely working in Uki. Then one name and the reasoning behind it — or a straight no.

Find my builder — free 3 minutes · no phone number · you pay nothing, ever
  • Costs you nothing, ever
  • No obligation to use them
  • Details never sold
Tweed CouncilTweed Local Environmental Plan 2014 Coastal
2,361Construction companies entered external administration in 2024–25 — more than any other industry in Australia (ASIC)
2Overlay families mapped in Uki, each one something a builder prices differently
12Heritage records intersecting Uki. Your own house need not be listed for them to reach your project

Why this is harder than it looks in Uki

Have us check instead — free →

Coastal — the kind of build this page is about. A drawing, not a photograph of a house in Uki.

What building in Uki actually involves

No acid sulfate soils — and every other Tweed locality has them

Uki returns no acid sulfate soils. That is a sourced result rather than an absence of data: New South Wales publishes acid sulfate mapping statewide and we read it, so a blank means the layer was checked and came back empty.

It is also genuinely distinguishing within this council. Pottsville, on low coastal ground twenty-odd kilometres east, carries 55 mapped features; Murwillumbah, on the river flats, carries 15. Uki is inland and up, in the caldera behind the coast, and the mapping stops.

For a build the effect is direct: Excavation is judged on what the ground will carry, not on what has to be neutralised and carted away. A pool, a cut for a garage, or a deep footing is priced on difficulty rather than on disposal — which is a materially different conversation from the one you would have thirty kilometres east.

Twelve heritage features, including a conservation area

The Tweed LEP maps 12 heritage features in Uki: 11 individual items and one general conservation area. For a village that is a dense footprint, and the conservation area is the one to check against your own address, because it applies inside its boundary whether or not your building is listed.

In a settlement of this size a conservation area is very likely to sit over the centre — which is exactly where a rebuild is most likely to be contemplated. Check it on the NSW Planning Portal spatial viewer before a design is drawn rather than after.

Two zones, and a village-scale height control

R2 Low Density Residential and R5 Large Lot Residential are mapped across 16.34 km². Maximum building height is 10 m on most mapped parcels, with 8 m appearing elsewhere, and a single minimum lot size band at 450–474 m².

The R5 land is where the servicing questions live: whether the parcel is sewered, what an on-site wastewater system would need, and how far power and water must be brought. On the R2 village land those questions mostly do not arise. Which applies is an address question.

What we cannot tell you

Flood. Flood sits outside the layers we read — New South Wales leaves the level to each council to set and publish. Uki sits on the Tweed River upstream of Murwillumbah, so this is a real question rather than a formality: ask Tweed Shire Council for the level at the address, in writing, before a floor level is set.

What you are dealing with in Uki

Six things a builder prices differently. This is the suburb-level picture — which of them reaches your block is an address check.

What is mapped in Uki

Read from NSW ePlanning Spatial Viewer, not a summary of it.

Council
Tweed Council
Planning scheme
Tweed Local Environmental Plan 2014
Overlays mapped here
Heritage — Conservation Area - General · Heritage — Item - General
Residential zones mapped
R2 Low Density Residential
R5 Large Lot Residential
Bushfire-prone land
Mapped in this suburb
Mine subsidence district
Not in one
Heritage items mapped
12
Minimum lot size
450-474 m² minimum (most common of 1 minimum-lot-size bands mapped in the suburb)
Typical height limit
10m
Floor space ratio
2:1
Acid sulfate soils
None mapped

Planning data from NSW ePlanning Spatial Viewer (CC BY 4.0), read 2026-09-20. Suburb-level, not a report on your block — check your address on the NSW Planning Portal.

Bushfire categories mapped here

Vegetation BufferVegetation Category 1Vegetation Category 2Vegetation Category 3
The category recorded for the suburb is not the rating for a lot. Where mapping reaches a block, a Bushfire Attack Level is assessed on that site and drives the construction standard.

Worth knowing before you budget

The mechanism

The Four-Point Builder Check™

Every one of them is something you could do yourself. What we sell is that it has been done, dated and published — and repeated on a schedule, because a check that happened once is worth nothing.

  • 01 · Licence

    Looked up on NSW Fair Trading's own public register — number, class and status, with the date we looked recorded.

  • 02 · Insurance

    Public liability plus whatever warranty or indemnity cover NSW requires. Sighted by us, not self-declared on a form.

  • 03 · Still trading

    Solvency re-checked on a schedule. A licence stays current right up until the day a company fails.

  • 04 · Works in Uki

    Confirmed with the builder against the suburbs they genuinely service — not a radius drawn on a map.

Have us run the check — free →

How this works

  1. 01
    Tell us about the build

    Six questions, about three minutes.

  2. 02
    We match it against Uki

    Against the 2 residential zones mapped here, 2 overlay families, bushfire-prone land — and against which builders hold the right licence class for it, have done it before, and actually work under Tweed Council.

  3. 03
    One recommendation, with the reasoning

    Not six quotes to sift. We negotiate on your behalf; you deal with the builder directly. Builders pay us, only once you sign.

What you get, and what it costs you

We are not a builder, we do not manage your build, and we do not hold your money.

A completed two-storey contemporary Australian home at dusk, built around a retained eucalypt.
Illustrative. We do not publish project photography until a builder we have checked gives us one of their own — so this is not a build of ours and not a house in Uki.

Fair questions before you send anything

Builders serving Uki

None verified in Uki yet. We will not list one we have not checked — give us the brief and we will go and find one. Tell us what you're building →

Questions about building in Uki

Are there acid sulfate soils in Uki?

No, and that is a sourced result rather than missing data — New South Wales publishes the mapping statewide and we read it. It is also distinguishing within this council: Pottsville, on low coastal ground, carries 55 mapped features and Murwillumbah, on the river flats, carries 15. Uki is inland and up, and the mapping stops.

What does that change about the build?

Excavation is judged on what the ground will carry, not on what has to be neutralised and carted away. A pool, a cut for a garage or a deep footing is priced on difficulty rather than on disposal.

Is there heritage in Uki?

Twelve features under the Tweed LEP — 11 individual items and one general conservation area. For a village that is dense. Check the conservation area against your own address, because it applies inside its boundary whether or not your building is listed, and in a settlement this size it very likely sits over the centre.

What zones are mapped?

R2 Low Density Residential and R5 Large Lot Residential across 16.34 square kilometres, with maximum building height 10 m on most mapped parcels. The R5 land raises the servicing questions — sewer, on-site wastewater, how far power and water must come — and the R2 village land mostly does not.

Is the parcel sewered?

On the R5 land, not necessarily. Ask Tweed Shire Council for the servicing position at the address before a design is commissioned, because an on-site wastewater system needs a soil assessment and a sized land application area, and it influences where the house can sit.

Is Uki flood affected?

We cannot answer it from our data. Flood sits outside the layers we read; New South Wales leaves the level to each council to set and publish. Uki is on the Tweed River upstream of Murwillumbah, so ask Tweed Shire Council for the level at the address in writing before a floor level is set.

What to ask a builder about a block in Uki

Each one is here because of something mapped in Uki. Take them to whoever quotes.

  1. 01

    Which of the 2 residential zones mapped in Uki covers this address, and what does that one permit that the others do not?

  2. 02

    What bushfire attack level have you built to in Uki before, and what did it change in the glazing, decking and screening?

  3. 03

    Have you had an application through Tweed Council where a heritage control applied, and how long did the assessment take?

  4. 04

    What height control is mapped at this address? It is set block by block in Uki, not suburb-wide.

Local landmarks in Uki

No catch

What you are agreeing to

  • Nothing. There is no contract with us, no account to create, no card, and nothing to cancel.
  • No obligation to use whoever we recommend. Take the name and the reasoning and do what you like with it, including nothing.
  • No phone number needed to start. Give us one if you want to be called; otherwise we write.
  • One builder contacts you, not six. And only after you have seen the brief and said yes.
  • Your details go to that builder and nobody else. Never sold, never auctioned, never shared with a panel.
  • If we have nobody in Uki, we say so. That is a real answer we give, and the empty builder list above is the proof we mean it.

Building in Uki?

Licence checked with NSW Fair Trading, insurance sighted, still trading, genuinely working in Uki. If we cannot find one worth recommending, we will say so.

Find my builder — free →

Free · about 3 minutes · no obligation · your details are never sold

Named watercourses in Uki

5 named watercourses are mapped across Uki. At that density the buildable ground is largely what sits between them, and the gullies they run in set the fall — which decides earthworks long before the floor plan does.

Read from the NSW Water Theme, which maps gazetted watercourses only. A constructed channel or a stormwater drain is not in this list and can still carry water across a block.