Find my builder
2 km
Oldbury — 41.09 km². Boundary from the ABS Australian Statistical Geography Standard 2021, simplified. The same boundary every figure on this page was read against.

WA · Armadale & Byford

Home builders in Oldbury

A builder’s licence is permission to trade. It is not a solvency test. 2,361 construction companies entered external administration last financial year, more than any other industry in the country — and no regulator checks whether the one quoting your Oldbury job can still pay its framer on Friday. We run the Four-Point Builder Check™: licence with Building and Energy WA, insurance sighted, still trading, and genuinely working in Oldbury. Then one name and the reasoning behind it — or a straight no.

Find my builder — free 3 minutes · no phone number · you pay nothing, ever
  • Costs you nothing, ever
  • No obligation to use them
  • Details never sold
Shire of Serpentine-JarrahdaleSerpentine Jarrahdale Local Planning Scheme No. 3 Greenfield · house and land
2,361Construction companies entered external administration in 2024–25 — more than any other industry in Australia (ASIC)
7Overlay families mapped in Oldbury, each one something a builder prices differently
1Heritage records intersecting Oldbury. Your own house need not be listed for them to reach your project

Why this is harder than it looks in Oldbury

Have us check instead — free →

Greenfield · house and land — the kind of build this page is about. A drawing, not a photograph of a house in Oldbury.

What building in Oldbury actually involves

Oldbury is 41.09 km² mapped Rural under the Serpentine Jarrahdale Local Planning Scheme No. 3, and no R-Code is mapped across it at all. That is the most important sentence on this page. In Western Australia the R-Code is the control that sets lot size, setbacks and what may be built — and here the scheme map does not carry one.

No R-Code means the answer is somewhere else

An absent R-Code normally means density is set by an endorsed structure plan or by a development approval rather than by the scheme, which is usual in newer estates. It does not mean anything is permitted, and it does not mean nothing is. It means the document governing a particular lot is not the scheme map, and finding out which document applies is the first task — the local government or the developer can confirm it.

The zoning is rural, not residential

Alongside Rural, the scheme maps Industrial development, Public open space, Drainage/waterway and several road reservations. There is no residential zone on the scheme map. A conventional house-on-a-block project is not what this land is zoned for as it stands, and anyone quoting one without establishing the structure-plan position is quoting a suburb that does not exist yet.

A public drinking water source area

A Special control area — Public drinking water source area is mapped. This is the constraint people underestimate most on rural land: it reaches what may be done on the land rather than what may be built on it, and on a lot without reticulated sewer that includes effluent disposal, chemical storage and fill. It sits over the zone and adds its own requirements.

Basic raw materials, and a development contribution

A Special control area — Basic raw material is mapped, which protects access to extractable resources such as sand and gravel and can restrict what is built over them. A Development contribution area No. 2 also applies — a charge attached to the land rather than to the house, established before an offer rather than before a design. A Drainage catchment management area and an Area of landscape protection complete the picture.

Bushfire across four features

Part of Oldbury is inside a designated Bush Fire Prone Area across four mapped features, so a Bushfire Attack Level applies where it reaches a lot. Ted Love Conservation Park sits within the suburb, and one heritage place is recorded.

What to establish on an Oldbury block

Whether a structure plan or development approval governs the lot, since the scheme map carries no R-Code. Then whether the land is in the public drinking water source area, because it reaches effluent and fill. Then the basic raw material and contribution positions. Then bushfire. If the answers do not line up, the honest conclusion may be that this is not a block to build a house on yet.

What you are dealing with in Oldbury

Six things a builder prices differently. This is the suburb-level picture — which of them reaches your block is an address check.

What is mapped in Oldbury

Read from Landgate SLIP, not a summary of it.

Council
Shire of Serpentine-Jarrahdale
Planning scheme
Serpentine Jarrahdale Local Planning Scheme No. 3
Overlays mapped here
Area of landscape protection · Development contribution area No.2 · Drainage catchment management · Policy areas · Special control area - Basic raw material · Special control area - Development control area/plan · Special control area - Public drinking water source area
Residential zones mapped
Drainage/waterway
Industrial development
Local distributor road
Local road
Primary distributor road
Public open space
Rural
Bushfire-prone land
Mapped in this suburb
Heritage places mapped
1
Urban growth area
Yes

Planning data from Landgate SLIP (CC BY 4.0), read 2026-09-19. Suburb-level, not a report on your block — check your address on the WA planning scheme maps.

Overlay families mapped here

Area of landsca…Development con…Drainage catchm…Policy areasSpecial control…Special control…Special control…
Each is a separate assessment with its own trigger, and most cover part of the suburb rather than all of it. Which of them reaches a particular block is an address question.

The mechanism

The Four-Point Builder Check™

Every one of them is something you could do yourself. What we sell is that it has been done, dated and published — and repeated on a schedule, because a check that happened once is worth nothing.

  • 01 · Licence

    Looked up on Building and Energy WA's own public register — number, class and status, with the date we looked recorded.

  • 02 · Insurance

    Public liability plus whatever warranty or indemnity cover WA requires. Sighted by us, not self-declared on a form.

  • 03 · Still trading

    Solvency re-checked on a schedule. A licence stays current right up until the day a company fails.

  • 04 · Works in Oldbury

    Confirmed with the builder against the suburbs they genuinely service — not a radius drawn on a map.

Have us run the check — free →

How this works

  1. 01
    Tell us about the build

    Six questions, about three minutes.

  2. 02
    We match it against Oldbury

    Against the 7 residential zones mapped here, 7 overlay families, bushfire-prone land, growth-area status — and against which builders hold the right licence class for it, have done it before, and actually work under Shire of Serpentine-Jarrahdale.

  3. 03
    One recommendation, with the reasoning

    Not six quotes to sift. We negotiate on your behalf; you deal with the builder directly. Builders pay us, only once you sign.

What you get, and what it costs you

We are not a builder, we do not manage your build, and we do not hold your money.

A completed two-storey contemporary Australian home at dusk, built around a retained eucalypt.
Illustrative. We do not publish project photography until a builder we have checked gives us one of their own — so this is not a build of ours and not a house in Oldbury.

Fair questions before you send anything

Builders serving Oldbury

None verified in Oldbury yet. We will not list one we have not checked — give us the brief and we will go and find one. Tell us what you're building →

Questions about building in Oldbury

What R-Code applies in Oldbury?

None is mapped on the scheme map. In Western Australia that normally means density is set by an endorsed structure plan or a development approval rather than by the scheme. Establishing which document governs a lot is the first task.

What zone is Oldbury?

Rural, alongside Industrial development, Public open space, Drainage/waterway and road reservations under the Serpentine Jarrahdale Local Planning Scheme No. 3. There is no residential zone on the scheme map.

What is the public drinking water source area?

A special control area sitting over the zone. It reaches what may be done on the land rather than what may be built on it, which on a lot without reticulated sewer includes effluent disposal, chemical storage and fill.

What is the basic raw material special control area?

A control protecting access to extractable resources such as sand and gravel. It can restrict what is built over them, and whether it reaches a particular lot is an address check.

Are there development contributions in Oldbury?

Development contribution area No. 2 is mapped. A contribution attaches to the land rather than the house, so it is established before an offer rather than before a design.

Is Oldbury bushfire-prone?

Part of Oldbury is inside a designated Bush Fire Prone Area across four mapped features. Where it reaches a lot, a Bushfire Attack Level applies and changes materials and cost.

What to ask a builder about a block in Oldbury

Each one is here because of something mapped in Oldbury. Take them to whoever quotes.

  1. 01

    Which of the 7 residential zones mapped in Oldbury covers this address, and what does that one permit that the others do not?

  2. 02

    What bushfire attack level have you built to in Oldbury before, and what did it change in the glazing, decking and screening?

  3. 03

    Have you had an application through Shire of Serpentine-Jarrahdale where a heritage control applied, and how long did the assessment take?

  4. 04

    Does the Jandakot District Structure Plan apply to this lot, and what does it change about layout or staging?

Local landmarks in Oldbury

Named plans that apply in Oldbury

Structure plans covering land here, as the authority names them. Which one governs your lot decides its density, layout and staging — check the address before you assume the zone alone sets the rules.

Source: catalogue.data.wa.gov.au/dataset/local-planning-scheme-zones-and-reserves-dop-025, read 2026-09-19.

No catch

What you are agreeing to

  • Nothing. There is no contract with us, no account to create, no card, and nothing to cancel.
  • No obligation to use whoever we recommend. Take the name and the reasoning and do what you like with it, including nothing.
  • No phone number needed to start. Give us one if you want to be called; otherwise we write.
  • One builder contacts you, not six. And only after you have seen the brief and said yes.
  • Your details go to that builder and nobody else. Never sold, never auctioned, never shared with a panel.
  • If we have nobody in Oldbury, we say so. That is a real answer we give, and the empty builder list above is the proof we mean it.

Building in Oldbury?

Licence checked with Building and Energy WA, insurance sighted, still trading, genuinely working in Oldbury. If we cannot find one worth recommending, we will say so.

Find my builder — free →

Free · about 3 minutes · no obligation · your details are never sold