Find my builder
500 m
Hove — 1.18 km². Boundary from the ABS Australian Statistical Geography Standard 2021, simplified. The same boundary every figure on this page was read against.

SA · Adelaide — Established & Coastal (KDR)

Home builders in Hove

A builder’s licence is permission to trade. It is not a solvency test. 2,361 construction companies entered external administration last financial year, more than any other industry in the country — and no regulator checks whether the one quoting your Hove job can still pay its framer on Friday. We run the Four-Point Builder Check™: licence with Consumer and Business Services, insurance sighted, still trading, and genuinely working in Hove. Then one name and the reasoning behind it — or a straight no.

Find my builder — free 3 minutes · no phone number · you pay nothing, ever
  • Costs you nothing, ever
  • No obligation to use them
  • Details never sold
City of Holdfast BayPlanning and Design Code Knockdown rebuild
2,361Construction companies entered external administration in 2024–25 — more than any other industry in Australia (ASIC)
7Overlay families mapped in Hove, each one something a builder prices differently
10Heritage records intersecting Hove. Your own house need not be listed for them to reach your project

Why this is harder than it looks in Hove

Have us check instead — free →

Knockdown rebuild — the kind of build this page is about. A drawing, not a photograph of a house in Hove.

What building in Hove actually involves

The minimum frontage mapped in Hove runs from 14 m down to 5 m. A near-threefold spread inside 1.18 km² is the single most consequential thing about building here, because frontage — not site area, not height — is usually what decides whether more than one dwelling fits on an allotment.

Five metres is a row dwelling figure

Where the minimum frontage is 5 m it applies across the board: detached, semi-detached, row, group and residential flat building all share it. That is a number written for attached housing on narrow lots, and it exists in one part of the suburb while another part requires 14 m for a detached dwelling. Two allotments of identical width can therefore have entirely different development potential, and nothing about the streetscape announces which is which.

Site area follows the same logic

Minimum site area for a detached dwelling is 250 m², with row and group dwellings down to 200 m² in one zone and 170 m² in another. Those are among the smaller figures in metropolitan Adelaide and they are what makes a multi-dwelling proposition arithmetically possible here. Site area and frontage are separate tests and both must be met — clearing one and failing the other is the usual way these projects end.

Heights to four levels

Mapped maximum heights are 9 m and 12 m, running from one to four levels. Four levels in a suburb of this size is a meaningful signal: it says the Code anticipates apartment-scale development somewhere in it, which matters as much for what may appear beside you as for what you may build.

Coastal flooding is a separate overlay from flooding

Hove carries a Coastal Flooding overlay as well as Hazards (Flooding — High) and Hazards (Flooding — General). They are three distinct instruments. The coastal one is concerned with inundation from the sea, including allowance for sea level rise, and where it applies it can set a minimum floor level on that basis rather than on rainfall or creek behaviour. On a block near the foreshore it is worth asking which of the three is driving any level you are given.

A Character Area Overlay, not a Historic Area Overlay

Hove is covered in part by a Character Area Overlay. It is a different instrument from the Historic Area Overlay used in some neighbouring suburbs and it is generally the lighter of the two, concerned with maintaining the prevailing character of an area rather than with historic fabric specifically. It still reaches demolition and replacement design where it applies, so it belongs in the pre-purchase search. Ten heritage places are separately recorded, local and State.

What to settle first in Hove

The minimum frontage at the address, because 5 m and 14 m describe different properties. Then the site area, since both tests apply. Then which of the three flood overlays reaches the block and what floor level follows. Then whether the Character Area Overlay covers the street.

What you are dealing with in Hove

Six things a builder prices differently. This is the suburb-level picture — which of them reaches your block is an address check.

What is mapped in Hove

Read from Planning and Design Code via SAPPA (PlanSA), not a summary of it.

Council
City of Holdfast Bay
Planning scheme
Planning and Design Code
Overlays mapped here
Hazards (Flooding — High) · Hazards (Flooding — General) · Coastal Flooding · Character Area Overlay · Local Heritage Place · State Heritage Place · Regulated and Significant Tree
Residential zones mapped
Established Neighbourhood
General Neighbourhood
Housing Diversity Neighbourhood
Waterfront Neighbourhood
Bushfire-prone land
None mapped
Local Heritage Places
10
Acid sulfate soils
None mapped
Minimum Frontage
5m; semi-detached dwelling is 5m; row dwelling is 5m; group dwelling is 5m; residential flat building is 5m to 14m; semi-detached dwelling is 14m
4 different values mapped across the suburb
Minimum Site Area
250 sqm; semi-detached dwelling is 200 sqm; row dwelling is 200 sqm; group dwelling is 200 sqm; residential flat building is 200 sqm to 600 sqm; semi-detached dwelling is 600 sqm
4 different values mapped across the suburb
Maximum Building Height (Metres)
9m · 12m
Maximum Building Height (Levels)
1 level to 4 levels
4 different values mapped across the suburb

Planning data from Planning and Design Code via SAPPA (PlanSA) (CC BY 4.0), read 2026-09-18. Suburb-level, not a report on your block — check your address on the SA Property and Planning Atlas.

Overlay families mapped here

Flooding — HighFlooding — Gene…Coastal FloodingCharacter AreaLocal Heritage …State Heritage …Regulated and S…
Each is a separate assessment with its own trigger, and most cover part of the suburb rather than all of it. Which of them reaches a particular block is an address question.

The mechanism

The Four-Point Builder Check™

Every one of them is something you could do yourself. What we sell is that it has been done, dated and published — and repeated on a schedule, because a check that happened once is worth nothing.

  • 01 · Licence

    Looked up on Consumer and Business Services's own public register — number, class and status, with the date we looked recorded.

  • 02 · Insurance

    Public liability plus whatever warranty or indemnity cover SA requires. Sighted by us, not self-declared on a form.

  • 03 · Still trading

    Solvency re-checked on a schedule. A licence stays current right up until the day a company fails.

  • 04 · Works in Hove

    Confirmed with the builder against the suburbs they genuinely service — not a radius drawn on a map.

Have us run the check — free →

How this works

  1. 01
    Tell us about the build

    Six questions, about three minutes.

  2. 02
    We match it against Hove

    Against the 4 residential zones mapped here, 7 overlay families — and against which builders hold the right licence class for it, have done it before, and actually work under City of Holdfast Bay.

  3. 03
    One recommendation, with the reasoning

    Not six quotes to sift. We negotiate on your behalf; you deal with the builder directly. Builders pay us, only once you sign.

What you get, and what it costs you

We are not a builder, we do not manage your build, and we do not hold your money.

A completed two-storey contemporary Australian home at dusk, built around a retained eucalypt.
Illustrative. We do not publish project photography until a builder we have checked gives us one of their own — so this is not a build of ours and not a house in Hove.

Fair questions before you send anything

Builders serving Hove

None verified in Hove yet. We will not list one we have not checked — give us the brief and we will go and find one. Tell us what you're building →

Questions about building in Hove

Why does frontage matter so much in Hove?

Because the mapped minimum runs from 14 m down to 5 m inside 1.18 km². Two allotments of identical width can have entirely different development potential depending on which figure applies, and nothing about the streetscape reveals it.

What does a 5 m minimum frontage allow?

It is a figure written for attached housing on narrow lots, and where it applies it covers detached, semi-detached, row, group and residential flat buildings alike. Elsewhere in the suburb a detached dwelling needs 14 m.

What is the minimum site area?

250 m² for a detached dwelling, with row and group dwellings down to 200 m² in one zone and 170 m² in another. These are among the smaller figures in metropolitan Adelaide. Site area and frontage are separate tests and both must be satisfied.

How tall can buildings be here?

Mapped maximum heights are 9 m and 12 m, from one to four levels. Four levels in a suburb this size signals that the Code anticipates apartment-scale development somewhere in it — relevant to what may appear beside you as well as what you may build.

What is the difference between the flooding overlays?

Hove carries three: Coastal Flooding, Hazards (Flooding — High) and Hazards (Flooding — General). The coastal one concerns inundation from the sea including sea level rise allowance, and can set a floor level on that basis rather than on rainfall or creek behaviour.

Is a Character Area Overlay the same as a Historic Area Overlay?

No. The Character Area Overlay is generally the lighter instrument, concerned with maintaining an area's prevailing character rather than historic fabric specifically. It still reaches demolition and replacement design where it applies, so check whether it covers your street.

What to ask a builder about a block in Hove

Each one is here because of something mapped in Hove. Take them to whoever quotes.

  1. 01

    Which of the 4 residential zones mapped in Hove covers this address, and what does that one permit that the others do not?

  2. 02

    Have you had an application through City of Holdfast Bay where a heritage control applied, and how long did the assessment take?

Local landmarks in Hove

No catch

What you are agreeing to

  • Nothing. There is no contract with us, no account to create, no card, and nothing to cancel.
  • No obligation to use whoever we recommend. Take the name and the reasoning and do what you like with it, including nothing.
  • No phone number needed to start. Give us one if you want to be called; otherwise we write.
  • One builder contacts you, not six. And only after you have seen the brief and said yes.
  • Your details go to that builder and nobody else. Never sold, never auctioned, never shared with a panel.
  • If we have nobody in Hove, we say so. That is a real answer we give, and the empty builder list above is the proof we mean it.

Building in Hove?

Licence checked with Consumer and Business Services, insurance sighted, still trading, genuinely working in Hove. If we cannot find one worth recommending, we will say so.

Find my builder — free →

Free · about 3 minutes · no obligation · your details are never sold